Extra volume allowance
Mistake: Entering 0.5 when you mean 50%.
Fix: Enter 50 for 50%; 0.5 represents 0.5%.
Sum slabs and cylindrical footings for a concrete crew’s order.
Runs offline in your browser. Once the page and required files have loaded, processing needs no internet.
Runs in your browser
Sum slabs and cylindrical footings for a concrete crew’s order.
Runs in your browser
Inputs are processed on this page and are never sent to a server.
Add separate measured sections. For slabs enter length and width; for cylinders enter outer and inner diameters (zero inner diameter means solid). Multiply by depth and count, then add your own allowance. Sections must not overlap.
V = Σ(LWHn) + Σ(π(D²−d²)Hn/4); Vₜ = V(1+a/100)
Planned volume: 1.32 m³ Net geometric volume: 1.2 m³ Added allowance: 0.12 m³
V = Σ(LWHn) + Σ(π(D²−d²)Hn/4); Vₜ = V(1+a/100)
Planned volume: 1.32 m³ Net geometric volume: 1.2 m³ Added allowance: 0.12 m³
No. It estimates volume only; reinforcement, loads, soil and structural design are outside scope.
Calculations run on your device. Form inputs are not sent to a server.
The initial choice follows your browser region. Your choice is remembered on this device. Gallons are US gallons. Switching units keeps your numbers unchanged and interprets them in the new unit.
Numbers stay unchanged. Check the new unit and enter the intended measurement, or select an example for that system.
Add separate measured sections.
Enter one item per row; each column describes that item.
Choose the mode that matches the data you entered.
Options: Rectangular slab · Cylinder / ring
For slabs enter length and width; for cylinders enter outer and inner diameters (zero inner diameter means solid).
Enter a numerical value for this quantity. Use the unit shown beside this field. m / ft
Minimum: 0.0001 · Maximum: 100000 m
For slabs enter length and width; for cylinders enter outer and inner diameters (zero inner diameter means solid).
Enter a numerical value for this quantity. Use the unit shown beside this field. m / ft
Minimum: 0 · Maximum: 100000 m
Multiply by depth and count, then add your own allowance.
Enter a numerical value for this quantity. Use the unit shown beside this field. m / ft
Minimum: 0.0001 · Maximum: 100000 m
Enter a whole number; fractional counts are not valid.
Minimum: 1 · Maximum: 1000000
Multiply by depth and count, then add your own allowance.
Enter a percentage, not its decimal fraction: 50 means 50%. Use the unit shown beside this field. %
Minimum: 0 · Maximum: 100 %
Add separate measured sections. For slabs enter length and width; for cylinders enter outer and inner diameters (zero inner diameter means solid). Multiply by depth and count, then add your own allowance. Sections must not overlap.
Calculated from your entries using the method below.
Add separate measured sections. For slabs enter length and width; for cylinders enter outer and inner diameters (zero inner diameter means solid). Multiply by depth and count, then add your own allowance. Sections must not overlap.
Calculated from your entries using the method below.
Add separate measured sections. For slabs enter length and width; for cylinders enter outer and inner diameters (zero inner diameter means solid). Multiply by depth and count, then add your own allowance. Sections must not overlap.
Calculated from your entries using the method below.
Multiply by depth and count, then add your own allowance.
Calculated from your entries using the method below.
Add separate measured sections. For slabs enter length and width; for cylinders enter outer and inner diameters (zero inner diameter means solid). Multiply by depth and count, then add your own allowance. Sections must not overlap.
Calculated from your entries using the method below.
Add separate measured sections. For slabs enter length and width; for cylinders enter outer and inner diameters (zero inner diameter means solid). Multiply by depth and count, then add your own allowance. Sections must not overlap.
Calculated from your entries using the method below.
Mistake: Entering 0.5 when you mean 50%.
Fix: Enter 50 for 50%; 0.5 represents 0.5%.
Mistake: Changing units and assuming the entered numbers were converted.
Fix: Numbers stay unchanged. Check the new unit and enter the intended measurement, or select an example for that system.
Mistake: Treating a result as valid outside the described scope.
Fix: No. It estimates volume only; reinforcement, loads, soil and structural design are outside scope.